    摘要:簡(jiǎn)介:Caledyne公司的全金屬井下封隔系統(tǒng),實(shí)現(xiàn)了真正的全部金屬體封隔油井,安全可靠,能夠抵抗極端條件。該公司采用了全金屬封隔的可回收橋塞(RBP),最近應(yīng)用于馬來(lái)西亞Bunga Kekwa一項(xiàng)目中,來(lái)臨時(shí)封堵一井。該RBP下于7,24...
    簡(jiǎn)介:Caledyne公司的全金屬井下封隔系統(tǒng),實(shí)現(xiàn)了真正的全部金屬體封隔油井,安全可靠,能夠抵抗極端條件。該公司采用了全金屬封隔的可回收橋塞(RBP),最近應(yīng)用于馬來(lái)西亞Bunga Kekwa一項(xiàng)目中,來(lái)臨時(shí)封堵一井。該RBP下于7,244 英尺處,經(jīng)過(guò)兩個(gè)月的井下作業(yè),取出后完好無(wú)損,顯示了其良好的機(jī)械性能。


    Caledyne’s metal-to-metal (MTM) downhole seal system provides a complete metal barrier that is reliable, durable, and resistant to extreme conditions.

    The company’s retrievable bridge plug (RBP), which incorporates the MTM seal, was recently deployed for Talisman on the Bunga Kekwa project in Malaysia to temporarily plug a well.

    The RBP was installed to a depth of 7,244 ft (2,208 m). The assembly was run, and the setting tool activated, which sheared off the bridge plug and removed it from the well.

    Well deviation at the RBP was 45° and was successfully pressure-tested to 350 psi. After one hour, a straight-line pressure test with zero dropoff was recorded, and after 24 hours, there was no pressure buildup in the tubing. A debris catcher was then installed above the RBP to keep out cuttings.

    A second tubing cut was required below the original cut after problems were encountered during repair activities. Because this process was performed without a debris catcher, considerable debris landed on top of the RBP. Multiple bailer and venture runs were carried out to remove the debris. The new completion components were installed a month after the RBP.

    When the plug was removed, the large amount of debris prevented the pulling tool from latching the fishing neck on the RBP, which resulted in further bailing runs to remove debris.

    At this point, the plug was released but could not be pulled. Several maximum overpulls of 30,000 lbf were applied that eventually moved the plug slowly uphole.

    With the plug removed, the RBP appeared to be in good condition with the MTM seal fully intact, sitting just above gauge diameter. The resilience of the RBP reflects the mechanical strength, construction, integrity, and design of the MTM seal, which had been downhole for two months.

    Since this initial deployment, the operator has ordered several additional RBP units for similar reservoir applications. 

    楊寶劍 是振威(全球)石油網(wǎng)的高級(jí)技術(shù)編輯,在石油技術(shù)資訊行業(yè)有八年的學(xué)識(shí)和經(jīng)驗(yàn)。他源源不斷地提供石油行業(yè)全球最新的技術(shù)創(chuàng)新、研發(fā)成果、現(xiàn)場(chǎng)應(yīng)用情況等信息。如果你對(duì)該項(xiàng)新技術(shù)有任何的疑問(wèn),或者對(duì)“新技術(shù)新產(chǎn)品”未來(lái)的內(nèi)容有任何問(wèn)題或建議,請(qǐng)聯(lián)系楊寶劍編輯 +86 10-58236512 Email:allenyo@zhenweiexpo.com 歡迎與行業(yè)互動(dòng)!
    關(guān)鍵字: Caledyne 全金屬 井下 封隔系統(tǒng) 
    關(guān)于我們 | 會(huì)員服務(wù) | 電子樣本 | 郵件營(yíng)銷 | 網(wǎng)站地圖 | 誠(chéng)聘英才 | 意見反饋
    Copyright @ 2011 CIPPE.NET Inc All Rights Reserved 全球石油化工網(wǎng) 版權(quán)所有 京ICP證080561號(hào)
    999精品久久久中文字幕蜜桃| 三上悠亚日韩精品| 国产精品水嫩水嫩| 久久精品国产亚洲Aⅴ蜜臀色欲| 99在线精品国自产拍中文字幕| 伊人久久精品线影院| 四虎国产精品永久在线看| 日韩一级视频在线观看播放| 国内精品videofree720| 国内精品久久久久影院老司| 久久久久久精品成人免费图片| 久久99精品福利久久久| 久久精品国产免费| 国内精品伊人久久久久av一坑| 久久精品国产精品亚洲| 国产精品 视频一区 二区三区| 日本精品夜色视频一区二区| 亚洲国产日韩在线成人蜜芽| 免费国产精品视频| 国产精品综合在线| 国产精品二区在线| 日韩国产精品99久久久久久| 精品哟哟哟国产在线不卡 | 国产精品高清尿小便嘘嘘| 亚洲AV成人精品一区二区三区| 亚洲精品综合在线影院 | 无码区日韩特区永久免费系列| 国产成人久久精品亚洲小说| 国产精品亚洲一区二区无码| 国产精品爽爽va在线观看无码| 日韩精品免费一区二区三区| 最新国产午夜精品视频不卡| 国产精品国三级国产AV| 国产成人精品实拍在线| 四虎成人国产精品视频| 国产精品亚洲精品日韩已方| 日韩免费的视频在线观看香蕉| 2021免费日韩视频网| 精品视频免费在线| 一区二区国产精品 | 一色屋成人免费精品网站|