導航:全球石油化工網 >> 資訊頻道 >> 技術裝備

    貝克休斯多段壓裂技術新應用(英)

    [加入收藏][字號: ] [時間:2009-11-10 全球石油網 關注度:0]
    摘要:簡介:貝克休斯最近宣布,利用其Frac-Point EX 多段壓裂系統在威廉森頁巖盆地成功進行了一次24段完井作業。該項目是球閥式隔離層帶項目中段數最多的項目之一。 Baker Hughes recently announced ...
    簡介:貝克休斯最近宣布,利用其Frac-Point EX 多段壓裂系統在威廉森頁巖盆地成功進行了一次24段完井作業。該項目是球閥式隔離層帶項目中段數最多的項目之一。


    Baker Hughes recently announced the successful running of a 24-stage completion in the Williston Basin of the Bakken shale using its Frac-Point EX multistage fracturing system (Frac-Point EX). The project represents one of the largest number of stages ever run using a ball/sleeve method for isolation.

    The original Frac-Point system was designed to allow operators to pinpoint fluid placement and volume during openhole fracturing operations, while eliminating the costs and complexities of cementing and perforating. Deployed as a one-trip installation and set in place by applying hydraulic pressure, the cost-effective system provides openhole isolation between zones, zone lobes, or fault lines so that fracture fluid is delivered where needed to maximize its effect.

    The Frac-Point EX extends the Frac-Point system’s capability to 24 stages. Baker Hughes states that this job was the first 24-stage Frac-Point EX system deployment.

    The system was deployed on the Ogden 11-3H well for Whiting Petroleum and allowed the single-trip isolation of 24 intervals with an 8,000-psi pressure rating, while achieving high frac rates through all the ball seats. Baker Hughes states that the achievement will lower operating costs for Whiting while enhancing completion performance.

    According to Bob Bennett, president of Baker Hughes’ Baker Oil Tools product line, “Lowering operating costs and increasing completion performance are top priorities for operators, given our current market environment. We believe our new system, which builds on the success and reliability of Baker Hughes’ original Frac-Point system and sets a new standard for downhole tool providers, will meet our clients’ expectations in areas like the Bakken shale and Three Forks where demand is increasing for the number of stages on a single-trip openhole completion.”

    Rick Ross, vice president of operations for Whiting Petroleum Corp. said, “As our ability to efficiently drill and complete longer horizontal laterals has increased, the need to increase the number of frac stages that can be pumped with a ball/sleeve system has become critically important to Whiting. Our relationship with Baker Hughes in North Dakota has resulted in the companies jointly pushing technology for more effective and efficient completions.”

    楊寶劍 是全球石油網的高級技術編輯,在石油技術資訊行業有八年的學識和經驗。他源源不斷地提供石油行業全球最新的技術創新、研發成果、現場應用情況等信息。如果你對“新技術新產品”的內容有任何問題或建議,請聯系楊寶劍編輯 +86 10-58236512 Email:allenyo@zhenweiexpo.com 歡迎您提供手中的最新技術文章!
    關鍵字: 貝克休斯 多段壓裂 
    關于我們 | 會員服務 | 電子樣本 | 郵件營銷 | 網站地圖 | 誠聘英才 | 意見反饋
    Copyright @ 2011 CIPPE.NET Inc All Rights Reserved 全球石油化工網 版權所有 京ICP證080561號
    精品午夜福利1000在线观看 | 国产成人亚洲合集青青草原精品| 国内午夜国产精品小视频| 日韩av激情在线观看| 一本大道无码日韩精品影视 | 国产女人18毛片水真多18精品 | 亚洲AV无码乱码麻豆精品国产| 久久精品国产福利国产秒| 九九久久精品无码专区| 国产69精品久久久久99尤物| 精品人妻一区二区三区四区在线| 日韩人妻无码中文字幕视频 | 伊人精品久久久大香线蕉99 | 国产精品久久久久9999高清| 在线观看日韩精品| 99久久综合给久久精品| 久久免费的精品国产V∧| 久久永久免费人妻精品| 久久精品94精品久久精品| 国产精品天天看天天狠| 精品亚洲综合久久中文字幕| 国产精品无码A∨精品影院| 亚洲精品狼友在线播放| 亚洲精品成人片在线观看精品字幕| a级国产精品片在线观看| 国产免费阿v精品视频网址| 国产丝袜在线精品丝袜| 成品人和精品人的区别在哪里| 99re这里只有精品热久久| 韩国三级中文字幕hd久久精品| 国产午夜精品理论片免费观看| 99久久免费国产精精品| 国产午夜精品一区理论片飘花 | 国产精品久久久久免费a∨| 2017国产精品自拍| 久九九精品免费视频| 亚洲日韩精品无码专区加勒比☆ | 国产高清精品在线| 国产精品福利在线观看免费不卡 | 网友偷拍日韩精品| 日韩精品真人荷官无码|