導航:全球石油化工網 >> 資訊頻道 >> 技術裝備

    墨西哥灣深水水平井鉆井平臺起火沉沒事故

    [加入收藏][字號: ] [時間:2010-05-27 博研論壇 關注度:0]
    摘要:   You may have heard the news in the last two days about the Deepwater Horizon drilling rig which caught fire, bur...


      You may have heard the news in the last two days about the Deepwater Horizon drilling rig which caught fire, burned for two days, thensank in 5,000 ft of water in the Gulf of Mexico.  There are still 11 men missing, and they are not expected to be found.  
    The rig belongs to Transocean, the world’s biggest offshore drilling contractor.  The rig was originally contracted through the year 2013 to BP and was working on BP’s Macondo exploration well when the fire broke out.  The rig costs about $500,000 per day to contract.  The full drilling spread, with helicopters and support vessels and other services, will cost closer to $1,000,000 per day to operate in the course ofdrilling for oil and gas. The rig cost about $350,000,000 to build in 2001 and would cost at least double that to replace today.


    Nautilus, being transported on a Heavy-Lift vessel


      The rig represents the cutting edge of drilling technology.  It is a floating rig, capable of working in up to 10,000 ft water depth.  The rig isnot moored; It does not use anchors because it would be too costly and too heavy to suspend this mooring load from the floatingstructure.  Rather, a triply-redundant computer system uses satellite positioning to control powerful thrusters that keep the rig on station within a few feet of its intended location, at all times. This is called Dynamic Positioning.
    The rig had apparently just finished cementing steel casing in place at depths exceeding 18,000 ft.  The next operation was to suspend the well so that the rig could move to its next drilling location, the idea being that a rig would return to this well later in order to complete the work necessary to bring the well into production.
    It is thought that somehow formation fluids – oil /gas – got into the wellbore and were undetected until it was too late to take action.  With a floating drilling rig setup, because it moves with the waves, currents, and winds, all of the main pressure control equipment sits on the seabed – the uppermost unmoving point in the well. This pressure control equipment – the Blowout Preventers, or ‘BOP’s” as they’re called, are controlled with redundant systems from the rig.  In the event of a serious emergency, there are multiple Panic Buttons to hit, and even fail-safe Deadman systems that should be automatically engaged when something of this proportion breaks out.  None of them were aparently activated, suggesting that the blowout was especially swift to escalate at the surface.  The flames were visible up to about 35 miles away.  Not the glow – the flames.  They were 200 – 300 ft high.
     

    上一頁12345下一頁
    關于我們 | 會員服務 | 電子樣本 | 郵件營銷 | 網站地圖 | 誠聘英才 | 意見反饋
    Copyright @ 2011 CIPPE.NET Inc All Rights Reserved 全球石油化工網 版權所有 京ICP證080561號
    国产精品无码AV天天爽播放器| 1313午夜精品理伦片| 日韩国产成人资源精品视频| 精品伊人久久久久网站| 无码精品尤物一区二区三区 | 视频精品一区二区三区| 国产在线精品二区韩国演艺界| 香蕉久久精品国产| 国产精品大尺度尺度视频| 玖玖精品在线视频| 亚洲国产成人精品青青草原| 久久精品国产亚洲AV嫖农村妇女| 无码精品日韩中文字幕| 国产精品99久久免费观看| 亚洲精品夜夜夜妓女网 | 精品熟女少妇AV免费观看 | 国产私拍福利精品视频| 国内精品免费视频自在线 | 夜夜高潮夜夜爽国产伦精品| 日韩精品免费一级视频| 日韩在线观看免费完整版视频| 国产精品久久久久9999赢消| 最新69国产成人精品免费视频动漫| 久久久久人妻精品一区三寸| 亚洲精品无码国产片| 亚洲欧洲精品成人久久曰| 午夜国产精品免费观看| 99精品国产一区二区三区2021| 国产精品亚洲精品| 国产精品手机在线| 亚洲精品456人成在线| 91情侣在线精品国产免费| 精品久久久久久中文字幕无码| 亚洲AV无码之国产精品| 国产香蕉九九久久精品免费| www亚洲精品久久久乳| 国产精品电影一区二区三区 | 日韩精品免费一线在线观看| mm1313亚洲国产精品美女| 国产精品va久久久久久久| 久久精品无码免费不卡|