墨西哥灣深水水平井鉆井平臺起火沉沒事故

    [加入收藏][字號: ] [時間:2010-05-27  來源:博研論壇  關注度:0]
    摘要:   You may have heard the news in the last two days about the Deepwater Horizon drilling rig which caught fire, bur...


      You may have heard the news in the last two days about the Deepwater Horizon drilling rig which caught fire, burned for two days, thensank in 5,000 ft of water in the Gulf of Mexico.  There are still 11 men missing, and they are not expected to be found.  
    The rig belongs to Transocean, the world’s biggest offshore drilling contractor.  The rig was originally contracted through the year 2013 to BP and was working on BP’s Macondo exploration well when the fire broke out.  The rig costs about $500,000 per day to contract.  The full drilling spread, with helicopters and support vessels and other services, will cost closer to $1,000,000 per day to operate in the course ofdrilling for oil and gas. The rig cost about $350,000,000 to build in 2001 and would cost at least double that to replace today.


    Nautilus, being transported on a Heavy-Lift vessel


      The rig represents the cutting edge of drilling technology.  It is a floating rig, capable of working in up to 10,000 ft water depth.  The rig isnot moored; It does not use anchors because it would be too costly and too heavy to suspend this mooring load from the floatingstructure.  Rather, a triply-redundant computer system uses satellite positioning to control powerful thrusters that keep the rig on station within a few feet of its intended location, at all times. This is called Dynamic Positioning.
    The rig had apparently just finished cementing steel casing in place at depths exceeding 18,000 ft.  The next operation was to suspend the well so that the rig could move to its next drilling location, the idea being that a rig would return to this well later in order to complete the work necessary to bring the well into production.
    It is thought that somehow formation fluids – oil /gas – got into the wellbore and were undetected until it was too late to take action.  With a floating drilling rig setup, because it moves with the waves, currents, and winds, all of the main pressure control equipment sits on the seabed – the uppermost unmoving point in the well. This pressure control equipment – the Blowout Preventers, or ‘BOP’s” as they’re called, are controlled with redundant systems from the rig.  In the event of a serious emergency, there are multiple Panic Buttons to hit, and even fail-safe Deadman systems that should be automatically engaged when something of this proportion breaks out.  None of them were aparently activated, suggesting that the blowout was especially swift to escalate at the surface.  The flames were visible up to about 35 miles away.  Not the glow – the flames.  They were 200 – 300 ft high.
     

    上一頁12345下一頁


              您的分享是我們前進最大的動力,謝謝!
    關于我們 | 會員服務 | 電子樣本 | 郵件營銷 | 網站地圖 | 誠聘英才 | 意見反饋
    Copyright @ 2012 CIPPE.NET Inc All Rights Reserved 全球石油化工網 版權所有
    京ICP證120803號 京ICP備05086866號-8 京公網安備110105018350
    国产精品美女流白浆视频| 亚洲偷自精品三十六区| 无码国模国产在线无码精品国产自在久国产 | av无码精品一区二区三区四区| 日韩成人无码影院| 国产精品视频福利| 色婷婷99综合久久久精品| 亚洲国产精品无码久久| 国产精品亚洲片夜色在线| 777亚洲精品乱码久久久久久| 日韩精品少妇无码受不了| 久久久亚洲精品无码| 久久精品亚洲综合一品| 久久精品香蕉视频| 久久老子午夜精品无码| 久久精品视频99精品视频150| 久久亚洲国产欧洲精品一| 久久精品国产亚洲沈樵| 国产综合色在线精品| 亚洲精品无码mv在线观看网站| 日韩精品无码免费专区午夜| 国产在线精品福利大全| 国产一区二区三区精品视频| 99re这里只有精品热久久| 国语自产精品视频在线观看| 国产在线精品国自产拍影院| 最新国产精品拍自在线观看| 国语自产偷拍精品视频偷拍| 中文字幕精品一区二区三区视频| 日韩精品无码免费专区午夜| 国产色婷婷五月精品综合在线| 国产精品香港三级国产AV | 国产精品扒开腿做爽爽的视频| 亚洲av午夜国产精品无码中文字 | 亚洲精品成a人在线观看夫| 亚洲中文字幕久久精品蜜桃| 伊人久久精品一区二区三区| 人妻少妇精品久久久久久| 精品久久久BBBB人妻| 国产精品一区二区综合| 中文字幕在线观看日韩|