墨西哥灣深水水平井鉆井平臺起火沉沒事故

    [加入收藏][字號: ] [時間:2010-05-27  來源:博研論壇  關注度:0]
    摘要:   You may have heard the news in the last two days about the Deepwater Horizon drilling rig which caught fire, bur...


      You may have heard the news in the last two days about the Deepwater Horizon drilling rig which caught fire, burned for two days, thensank in 5,000 ft of water in the Gulf of Mexico.  There are still 11 men missing, and they are not expected to be found.  
    The rig belongs to Transocean, the world’s biggest offshore drilling contractor.  The rig was originally contracted through the year 2013 to BP and was working on BP’s Macondo exploration well when the fire broke out.  The rig costs about $500,000 per day to contract.  The full drilling spread, with helicopters and support vessels and other services, will cost closer to $1,000,000 per day to operate in the course ofdrilling for oil and gas. The rig cost about $350,000,000 to build in 2001 and would cost at least double that to replace today.


    Nautilus, being transported on a Heavy-Lift vessel


      The rig represents the cutting edge of drilling technology.  It is a floating rig, capable of working in up to 10,000 ft water depth.  The rig isnot moored; It does not use anchors because it would be too costly and too heavy to suspend this mooring load from the floatingstructure.  Rather, a triply-redundant computer system uses satellite positioning to control powerful thrusters that keep the rig on station within a few feet of its intended location, at all times. This is called Dynamic Positioning.
    The rig had apparently just finished cementing steel casing in place at depths exceeding 18,000 ft.  The next operation was to suspend the well so that the rig could move to its next drilling location, the idea being that a rig would return to this well later in order to complete the work necessary to bring the well into production.
    It is thought that somehow formation fluids – oil /gas – got into the wellbore and were undetected until it was too late to take action.  With a floating drilling rig setup, because it moves with the waves, currents, and winds, all of the main pressure control equipment sits on the seabed – the uppermost unmoving point in the well. This pressure control equipment – the Blowout Preventers, or ‘BOP’s” as they’re called, are controlled with redundant systems from the rig.  In the event of a serious emergency, there are multiple Panic Buttons to hit, and even fail-safe Deadman systems that should be automatically engaged when something of this proportion breaks out.  None of them were aparently activated, suggesting that the blowout was especially swift to escalate at the surface.  The flames were visible up to about 35 miles away.  Not the glow – the flames.  They were 200 – 300 ft high.
     

    上一頁12345下一頁


              您的分享是我們前進最大的動力,謝謝!
    關于我們 | 會員服務 | 電子樣本 | 郵件營銷 | 網站地圖 | 誠聘英才 | 意見反饋
    Copyright @ 2012 CIPPE.NET Inc All Rights Reserved 全球石油化工網 版權所有
    京ICP證120803號 京ICP備05086866號-8 京公網安備110105018350
    人人妻人人澡人人爽人人精品 | 久久亚洲精品视频| 久久精品国产久精国产果冻传媒 | 99久久婷婷国产综合精品| 国产精品午夜爆乳美女视频| 中文字幕日韩精品有码视频| 亚洲日韩亚洲另类激情文学| 久久精品视频一区| 精品无人乱码一区二区三区| 青草国产精品视频。| 2021国内精品久久久久影院| 久久99精品久久久久久清纯| 国产麻豆va精品视频| 亚洲?V乱码久久精品蜜桃| 亚洲国产高清在线精品一区 | 精品国产乱码久久久久软件| 精品无码日韩一区二区三区不卡| 在线观看亚洲AV日韩A∨| 99精品高清视频一区二区| 亚洲精品蜜夜内射| 久久93精品国产91久久综合| 精品国产乱码久久久久久1区2区| 亚洲精品中文字幕无乱码麻豆| 国产精品久久久久蜜芽| HEYZO无码综合国产精品| 国产亚洲精品VA片在线播放| 久久精品成人免费看| 国产精品久久现线拍久青草| 精品无码av一区二区三区| 精品国产理论在线观看不卡| 国产精品jizz视频| 亚洲国产日韩精品| 亚洲精品一卡2卡3卡三卡四卡| 日韩精品中文字幕第2页| 亚洲av成人无码久久精品| 夜夜爽一区二区三区精品| 久久精品国产网红主播| 日韩免费a级在线观看| 人妻少妇精品无码专区| 国产精品免费一区二区三区 | 5x社区精品视频在线播放18|